Power Station Steelwork


Project name

Location

Country

Market area

 

Power Station Steelwork

Power Station

Northern Ireland

General Industrial

 

Requirement

Recoating of structural steel giving long term protection.

Preparation

Surfaces degreased and pressure jetted prior to hand preparation to St3 standard of EN ISO 8501-1: 2007. Preparation was completed by a fresh water wash to remove any dust created.

Coatings

One coat of Corroless™ EPF Primer and one coat of Corroless™ RF65 were applied with stripe coating where appropriate.

Product (per coat)

DFT (per coat)

Colour

Corroless™ EPF

200 microns
plus stripe coat

Buff

Corroless™ RF65

50 microns

Blue

 

Comments: 
System has an expected life of 15 to 25 years before major maintenance.