Power Station Steelwork
Project name |
Location |
Country |
Market area |
|
Power Station Steelwork |
Power Station |
Northern Ireland |
General Industrial |
Requirement
Recoating of structural steel giving long term protection.
Preparation
Surfaces degreased and pressure jetted prior to hand preparation to St3 standard of EN ISO 8501-1: 2007. Preparation was completed by a fresh water wash to remove any dust created.
Coatings
One coat of Corroless™ EPF Primer and one coat of Corroless™ RF65 were applied with stripe coating where appropriate.
Product (per coat) |
DFT (per coat) |
Colour |
---|---|---|
Corroless™ EPF |
200 microns |
Buff |
Corroless™ RF65 |
50 microns |
Blue |
Comments:
System has an expected life of 15 to 25 years before major maintenance.