Railway Station Steelwork


Project name

Location

Country

Market area

 

Railway Station Steelwork

Cumbria

UK

Bridges

 

Requirement

Refurbishment of station steel work.

Preparation

Surfaces degreased and pressure jetted to remove salt contamination prior to hand preparation to St3 standard of EN ISO 8501-1: 2007. Surfaces then steam cleaned to ensure full removal of salt contamination. Tests for salt carried out prior to coating.

Coatings

A primer coat of Corroless™ EPF and a top coat of Corroless™ RF65. Stripe coats were applied where appropriate for both coats.

Product (per coat)

DFT (per coat)

Colour

Corroless™ EPF

200 microns
plus stripe coat

Buff

Corroless™ RF65

50 microns
plus stripe coat

various

 

Comments: 
System had Network Rail Approval (XM92/M24-084) with an expected life of 15 years.