Centene

reviving the 70s

Built in the 1970s, the curtainwall system of this 10-story Centene Office Building was updated to match the colour design of its corporate campus.

Ventana Construction and the Clayco Corporation teamed up for the quick removal and replacement of the curtainwall system via custom colour architectural metal finishes from Axalta Coating Systems.

Applying Durapon 70® Centene Silver to the interior and Ceranamel™ E5000 CX Centene Silver to the exterior, timeliness and precision were of the utmost importance as the building was occupied for the duration of the project.

ventana.vc
www.performancearch.com
www.bonnellaluminum.com

This case study was featured in vibes colour journal